West Plaza Lobby & Foyer – Argon Construction Supply & installation of cantilevered glass with capping rail, refurbish lift doors, entrance columns & skirting.
Teachers Training College – Teak Construction Galvanised mild steel feature balustrades to internal mezzanines and external stairs.
Parklands Apartments – Hartner Construction Supply & installation of 900 metres of intricate galvanised and powder coated balcony balustrades and handrails, stainless steel bar & reception fitout
Leftfield Bar – Hartner Interiors Supply & installation of stainless steel balustrade, to main stair & void, & decorative Playstation trolleys
Clear Communications – Woods Glass Supply & installation of 500 metres of stainless steel handrails to atrium including two six floor glass sided stairs & attached bridges
Planet Hollywood Retail Fitout – Watts & Hughes Construction Supply & installation of sixteen (10) metre tall display stands including full height brush/bead blasted stainless panels
Princes Wharf Apartments – Hartner Construction Supply & installation of 7,800 metres of marine grade stainless steel balustrade, complete with glass infil and hardwood top rail
Craig Craig Moller – Aspec Construction Supply & installation of brushed stainless wall panelling, edge capping and reception counter supports
Ernst Young – Practec Interiors Supply & installation of perforated stainless steel feature panels including tubular stainless steel frames
Kauri Cliffs Golf Course, Keri Keri – Haydn & Rollett Supply & installation of (20) zinc fireplace surrounds, & brass thresholds for chalets and guest lodge
ASB Intermediate Recovery Centre – Mainzeal Construction Supply & installation of 770 metres of mild steel balustrade, reed bed, lift shaft cladding, and other various architectural metalwork
Transrail – Arrow International Supply & installation of 80 metres of powder coated mild steel balustrade with perforated infil panels and stainless steel top rail
Buddle Findlay – Aspec Construction Supply & installation of a feature staircase in the PWC building consisting of a polished stainless steel central truss, stainless steel stringers & steps, supported by rigging wire around the perimeter of the stair.
Renaissance Tower – Cabella Construction Supply & installation of a 1400 metres of fabricated powder coated aluminium balustrade for external balconies.
Uptown Apartments – Construct Management Pacific Supply & installation of 375 metres of powder coated “Eclipse” type aluminium balustrade including glass
Viaduct Point – Multiplex Construction Supply & installation of a all internal and external balustrades and perimeter fencing including stainless and mild steel fabrication, and glazing.
Hyatt – Walters Construction Supply & installation of all internal stair balustrades,(total 60 levels) and 17 floors of external balcony handrails.
“V” Apartments – Hawkins Construction Supply & installation of all internal stair balustrades and handrails, and 140 metres of cantilevered glass, external, balustrade with timber top rail.
Britomart Station – Downer Construction Supply & installation of all steel stringer plates, intercity platform cladding, 1000 metres mirror finished handrails and balustrade, 90 metres polished stainless cantilevered glass channel.
Parliament St – Multiplex Construction Supply & installation of all internal stair balustrade and 1800 metres of painted steel external balustrades, modesty panels, and internal stairs.
H47 Apartments – Watts & Hughes Construction Supply & installation of all internal stair balustrades and handrails, and 800 metres of Powder coated external, balustrade with glass infill panels.
Logfarm Apartments – Multiplex Construction Supply & installation of all internal stainless and jarrah stair handrails, external stainless steel glazing channels, jarrah clad pedestrian and vehicle access gates.
Keystone Apartments – Construct Management Pacific Supply & installation of all external aluminium balustrade with glass infill panels.
Alpha Apartments – Hawkins Construction Supply & installation of 1200 metres of zinc sprayed and painted external balustrades, stair balustrades and internal stair balustrades.
Population Health Centre – Fletcher Construction Supply & installation of 420 metres of stair balustrades consisting of large glazed panels, or galvanised panels with stainless steel handrails.
Sky City – Fletcher Construction Supply & installation of (3) main egress stair balustrades consisting approximately 410 metres of painted mild steel balustrade and hand rail.
Perspective Apartments – Arrow International Supply & installation of 430 metres of external balustrade with glass infill panels.
Zest Apartments – Multiplex Construction Supply & installation of 2,300 metres of external aluminium balustrades, 300 modesty panels, & two 17 storey galvanised mild steel stair balustrades.
Auckland University of Technology – Fletcher Construction Supply & installation of 200 metres of stair balustrades consisting of glazed infill panels supported within a painted steel balustrade,& two painted steel stair balustrades.
Vodafone House – Watts & Hughes Construction Supply & installation of stainless steel handrails and balustrades for the podium and public areas.
KPMG – Watts & Hughes Construction Supply & installation of stainless steel handrails and balustrades for the podium and public areas.
Hudson Brown Apartments – Dominion Constructors Supply & installation of 600 metres of galvanised steel & aluminium balustrades, stairs, and sun screens.
Designer Stainless NZ Limited 16A Bay Park Place, Beach Haven - PO Box 36 544 Northcote, Auckland NZ - Ph 09 482 1330 - Fx 09 482 1316